Chapter 19: From the Bulk System to the Customer

A region can have enough electricity available and still have customers sitting in the dark. It can also have a widespread supply shortage that reaches customers as an interruption. The experience at a socket is the result of a chain, and an assessment of one part of that chain cannot tell us everything about the rest.

So far, our hypothetical region has largely been viewed from the bulk system: resources, demand, and the transmission paths connecting areas. The U.S. Department of Energy’s 2024 report on resource adequacy treats adequacy as a system question involving a portfolio of resources and networks. It asks whether electricity needs can be met under the conditions being assessed. That is a different question from how often a particular group of customers has actually lost service, and for how long. [S8]

The distinction matters because the word reliability can cover both. A planning assessment looks ahead using assumptions about demand, resource performance, and delivery. An interruption record looks back at service experienced by a defined customer population. Neither is a complete substitute for the other.

Electricity that reaches an area through the bulk system still has to reach individual customers through local distribution networks. An interruption recorded at the customer end tells us that service was lost; it does not, by itself, identify where the initiating problem occurred. To make that diagnosis for a real event, we would need the relevant utility and operator records, including the event’s timing, affected locations, and reported cause.

The U.S. Energy Information Administration, or EIA, publishes customer interruption measures for the United States. Its table updated in October 2026 reports several indices both with and without major events. The table also identifies limits in coverage and differences in reporting methods, so its figures need to be read with those qualifications in mind. [S11]

Three abbreviations provide a useful starting point: SAIDI, SAIFI, and CAIDI. They describe duration and frequency from different angles.

SAIDI, the System Average Interruption Duration Index, is the total duration of counted customer interruptions divided by the number of customers in the population being assessed. In EIA’s table, the interruptions are non-momentary. It is commonly expressed in minutes per customer. If one customer loses service for 60 minutes, that contributes 60 customer-minutes. If ten customers each lose service for 60 minutes, the contribution is 600 customer-minutes. [S11]

SAIFI, the System Average Interruption Frequency Index, is the total number of counted customer interruptions divided by the number of customers in the population. EIA’s table counts non-momentary interruptions. It is expressed as interruptions per customer. One counted event that interrupts ten customers contributes ten customer interruptions to this count. [S11]

CAIDI, the Customer Average Interruption Duration Index, divides total counted customer interruption duration by the number of counted customer interruptions. In EIA’s table, it describes average restoration time for non-momentary interruptions, rather than duration per customer in the full population. These measures answer related but distinct questions about recorded interruptions. [S11]

The denominators are the key. SAIDI spreads interruption time across the entire customer population, including customers who experienced no interruption in the period. SAIFI similarly spreads the number of interruptions across that population. CAIDI considers the interruptions that occurred. A customer who was interrupted twice contributes twice to the interruption count; CAIDI is not necessarily the average time per distinct customer who lost service.

Consider an invented record for a small part of the hypothetical region. The population is fixed at 100 customers for the period. For this exercise, count each loss of service as one interruption for each affected customer, measure its full duration in minutes, and assume there are no other interruptions.

The record contains two events:

  • Event A interrupts 20 customers for 30 minutes each. It is stipulated to be a non-major event.
  • Event B interrupts 10 of the same 20 customers for 120 minutes each. It is stipulated to be a major event.

The labels are assumptions for the exercise. They do not show how a real utility would classify either event.

Event A contributes 20 × 30, or 600 customer-minutes, and 20 customer interruptions. Event B contributes 10 × 120, or 1,200 customer-minutes, and 10 customer interruptions. Together, the two events produce 1,800 customer-minutes and 30 customer interruptions.

With both events included:

  • SAIDI is 1,800 customer-minutes ÷ 100 customers = 18 minutes per customer.
  • SAIFI is 30 customer interruptions ÷ 100 customers = 0.30 interruptions per customer.
  • CAIDI is 1,800 customer-minutes ÷ 30 customer interruptions = 60 minutes per interruption.

These are averages, not a description of what happened to each customer. Eighty customers had no interruption in this invented record. Ten experienced one 30-minute interruption. The remaining ten experienced two interruptions, totaling 150 minutes each. No individual customer had an interruption lasting 18 minutes; that figure is the total customer interruption time spread across all 100 customers.

The overlap also shows why the count of customer interruptions differs from the count of distinct affected customers. There were 30 customer interruptions, but only 20 different customers were interrupted. Dividing 1,800 customer-minutes by 20 affected customers would produce 90 minutes per distinct affected customer. That is a possible description of this record, but it is not the CAIDI calculation used in the exercise.

Now exclude the event stipulated as major. Event A remains, with 600 customer-minutes and 20 customer interruptions. SAIDI becomes 600 ÷ 100, or 6 minutes per customer. SAIFI becomes 20 ÷ 100, or 0.20 interruptions per customer. CAIDI becomes 600 ÷ 20, or 30 minutes per interruption.

The two presentations describe the same invented history through different boundaries. Including Event B shows its contribution to the total interruption experience. Excluding it allows the remaining record to be examined separately. Neither number, standing alone, tells a reader everything about service. In particular, excluding an event from a reported measure does not mean the affected customers did not experience it.

The major-event label deserves care. In our exercise it was assigned in advance to an individual event. EIA’s table uses mixed reporting methods: utilities using the IEEE method compare each day’s SAIDI with a Tmed threshold derived from five previous years of daily SAIDI values, while utilities not using IEEE methods self-determine major events. The day-based screen is distinct from our stipulated event label. A reader should not classify an event merely because its duration or visible consequences seem unusually large. EIA presents measures with and without major events, and its coverage and reporting notes remain part of interpreting them. [S11]

A useful way to read a published result is to begin with its boundaries. Which customers are included in the denominator? What period does the measure cover? Are major events included? Are the figures intended to represent an individual utility, a state, or a wider reporting population? Those questions do not make an index less useful. They establish what it can reasonably tell us.

Consider two hypothetical systems that report the same SAIDI. One could have many brief interruptions, while the other has fewer interruptions that last longer. SAIFI and CAIDI help reveal that difference. Yet even all three indices can leave important details hidden. Customers with no interruption and customers with repeated interruptions may be combined in the same population average. The indices do not show the full distribution of individual experiences, the places affected, or the sequence in which service was lost and restored.

They also do not establish the initiating cause of an interruption. Suppose the 120-minute Event B occurred during a period when the region had ample generation available. The arithmetic would remain the same, but the customer record alone would not establish why those ten customers lost service. Conversely, if the region faced a supply shortfall during the event, the timing alone would not prove that the shortfall caused this particular interruption. A causal account needs a documented connection between system conditions and the affected customers.

This is where the boundary with resource adequacy becomes especially important. A customer interruption index is a summary of recorded service loss over a period and population. A resource-adequacy assessment examines the ability of a system to meet demand under specified conditions. DOE’s 2024 U.S. report frames that latter question across a portfolio of resources and networks. The two kinds of evidence can inform a broader discussion, but one cannot be read directly as the other. [S8]

For example, low recorded interruption duration in a historical period would not, by itself, establish that the future resource portfolio is adequate under a planner’s scenarios. It would describe the interruptions captured by that historical measure. Equally, an adequacy assessment that finds sufficient resources under its assumptions would not guarantee that every customer avoids a local interruption. The assessment and the index have different time boundaries, inputs, and purposes.

Comparisons between reported interruption figures require similar restraint. EIA’s U.S. table includes reporting-coverage notes and mixed reporting methods. Before treating a difference between two reported figures as evidence that one system delivers better service, a reader should examine whether their populations, periods, event treatment, and methods are sufficiently comparable for the question. [S11] A larger reported average is a reason to investigate its components; it is not, on its own, an explanation of them.

The exercise can be extended without adding any new events. Ask what information would change if the ten customers affected by both events were scattered across the area rather than clustered together. The three calculated indices would stay the same, because their inputs would still be 1,800 customer-minutes, 30 customer interruptions, and 100 customers. The geographical pattern, however, could matter to an investigation. The index values alone cannot reveal it; the underlying location and event records would be needed.

Now ask what would happen to CAIDI if there were no interruptions in a reporting period. Total customer interruption duration and the number of customer interruptions would both be zero. Since division by zero is undefined, CAIDI cannot be calculated from those inputs. The absence of a calculable value should not be confused with an average interruption lasting zero minutes.

These details bring the discussion back to the customer without losing sight of the system. A person pays attention to whether electricity is available when needed. Planners and operators need to examine several questions behind that experience: whether resources are sufficient under assessed conditions, whether electricity can be delivered across the network, and what interruption records show about service to customers.

Each measure makes part of that picture visible. The disciplined step is to keep its boundary attached: which customers, which period, which events, and which question. Only then can an average become the beginning of a useful investigation rather than the end of one.