Chapter 13: Storage During a Long Need

A store of electricity can be ready at the beginning of a difficult hour and depleted before a difficult day is over. That distinction is easy to miss when the discussion centers on its maximum power. A resource able to discharge at 100 megawatts may help substantially during a one-hour peak. Whether it can provide the same power through several hours, or return to service for another peak, depends on the energy it starts with and what happens between calls on it.

The question is not simply how much energy the store can hold. It is whether usable energy is available at the times when the rest of the system needs it. A full store has options that a nearly empty one does not. A depleted store can recover only if it has an opportunity to charge, and the value of that opportunity depends on its duration, the permitted charging rate, and the electricity available to supply it.

Ontario’s March 2026 resource-adequacy methodology addresses this kind of time-dependent problem using a chronological assessment: modeled conditions are followed in sequence, with storage power, energy, and charging constraints among the inputs. Its method is specific to the Ontario assessment; it is not a rule that every system must use the same model or assumptions. [S13]

To see why sequence matters, return to the hypothetical region and the store introduced in the previous chapter. It can discharge at a sustained 100 MW and begins with 400 megawatt-hours of usable energy, measured at the same output boundary as the discharge. Under those assumptions, its nominal duration at full power is four hours. For the arithmetic below, assume it can deliver the stated power whenever called upon, that its energy never exceeds 400 MWh, and that charging adds usable energy at the rates stated. We set losses aside rather than assigning an unsupported efficiency. These are invented conditions for an exercise, not a description of an actual facility.

First, suppose the region has a one-hour period in which it needs an additional 100 MW. The store begins full and discharges at 100 MW for the whole hour. It supplies:

100 MW × 1 hour = 100 MWh.

At the end of the hour, it has 300 MWh of usable energy left. Under the exercise’s assumptions, the store has covered that particular need and retained three-quarters of its initial energy. The result tells us something useful about this hour. It does not establish that the region is adequate for a season or that the store will be full when a real peak arrives.

Now consider a different sequence. The store again starts with 400 MWh. The region needs an additional 100 MW for three consecutive hours. After supplying 300 MWh, the store has 100 MWh remaining. There follows a two-hour interval when charging is possible, but the assumed charging opportunity adds usable energy at only 50 MW. Over those two hours the store gains 100 MWh, bringing it to 200 MWh.

A second scarcity interval then begins, with another need for 100 MW lasting three hours. The store can supply 100 MW for the first two hours, using its remaining 200 MWh. It has no usable energy left for the third hour. Under these simplified assumptions, the second interval requires 300 MWh, while the store supplies 200 MWh and leaves 100 MWh of the stated need to be met by something else.

The store has not failed to perform its assumed job. Across the two scarcity intervals, it has delivered 500 MWh: the original 400 MWh plus 100 MWh added between the intervals. The shortage arises because the requested discharge totals 600 MWh and the intervening charge is too small to bridge the difference. Another resource, a reduction in demand, an import, or a different operating arrangement would have to cover the remaining need in this example, if available and deliverable.

Change just one assumption. If the same two-hour charging interval can add usable energy at 100 MW, it restores 200 MWh instead of 100 MWh. After the first three-hour discharge, the store rises from 100 MWh to 300 MWh. It can then supply the second three-hour interval in full. The discharge rating and initial energy have not changed. The difference is the charging opportunity.

That opportunity should not be treated as free or automatic. In the example, saying that charging can add usable energy at 100 MW is an assumption about the whole interval. It leaves open whether enough electricity would actually be available to charge the store while meeting other demand, whether charging equipment could sustain that rate, and whether the network could deliver the required power. If losses were included, the energy drawn for charging would need to be reconciled with the smaller amount of usable energy added to the store. The example assigns no numerical loss and makes no claim about a particular technology’s efficiency.

The timing of the charging interval also matters. A two-hour opportunity after the second scarcity period cannot help the store serve that period. An annual total showing ample electricity for charging would not, on its own, prove that electricity was available in the right hours. Similarly, knowing only that the store delivered 500 MWh across the example would not reveal which hour remained uncovered. A chronological account keeps the opening balance, each discharge, each charge, and the closing balance in their proper order.

Try a third version before reading on. The store starts with 400 MWh. The first scarcity interval lasts two hours at 100 MW. It can then charge for one hour at an assumed rate that adds 50 MWh of usable energy per hour. The second scarcity interval lasts three hours at 100 MW. How much of the second interval can the store cover?

The first interval uses 200 MWh, leaving 200 MWh. Charging adds 50 MWh, so the second interval begins with 250 MWh. At 100 MW, that energy lasts two and a half hours. The store covers the first two hours in full and, assuming it can sustain 100 MW until the energy is exhausted, the first half of the third. The remaining half-hour of need is 50 MWh. A different discharge schedule could place that uncovered energy elsewhere within the interval, but it could not produce more than the 250 MWh available at the start under the stated assumptions.

This is why the phrase “a three-hour shortage” needs care. It could describe a constant need for 100 MW, as in the exercise, or a changing need that rises and falls. Those profiles can require different discharge schedules even if their total energy is the same. A store may have enough energy in total but too little power for the highest part of a need; it may also have enough power for the peak but too little energy to sustain it. Both limits matter, and neither can be inferred from the other.

A long interval is not the only challenge. Repeated shorter intervals can draw down energy if the time or charging capability between them is insufficient. Conversely, a long period on the calendar need not mean continuous discharge at maximum power: the actual requirement may vary, and there may be opportunities to recharge. To assess a real case, a planner needs a time sequence of demand, other resource availability, charging conditions, losses, and dispatch assumptions. The arithmetic alone cannot tell us how often such a sequence will occur or what an operator would do.

Those distinctions also explain why storage’s contribution to resource adequacy cannot be read directly from its nominal duration. Adequacy asks whether a system can meet demand under specified conditions. The question concerns a portfolio, not a store in isolation: other resources and the pattern of demand affect when stored energy is needed and when it can be replenished.

One way to express an assessed contribution is effective load carrying capacity, or ELCC. In broad terms, it asks how much additional demand a resource can support while maintaining a specified level of assessed adequacy. The answer is conditional on the assessment and the system in which the resource is considered. Ontario’s August 2025 storage ELCC study evaluates storage in a particular system and portfolio context; its findings should not be treated as a universal credit for every store of a given duration. [S6]

Our two-interval calculation is not an ELCC calculation. It describes one invented sequence with perfect knowledge of the stated need and simplified charging. It does not assess a range of possible conditions, apply an adequacy criterion, or measure how much additional demand the region could support. Ontario’s separately dated March 2026 methodology describes a chronological approach with assumptions about demand, resources, storage constraints, and transmission capabilities. Those features illustrate the broader task without making our small example a reproduction of the Ontario study. [S13]

A useful question for any storage proposal is therefore: What sequence is the resource being asked to survive? A single one-hour peak, several peaks separated by charging opportunities, and a prolonged period with limited charging call for different evidence. Ask for the starting usable energy, discharge and charging limits, the assumed opportunities to charge, and the conditions under which other resources are available. Then ask what happens if the sequence changes.

Storage can move energy toward a time when it is more useful, but the amount it can move through successive needs depends on what enters, what leaves, and when. For a real multiday or seasonal assessment, those quantities must come from a defined chronological study and evidence suited to the resource and system. The result is not a verdict on storage in general. It is an answer to a more precise question: how much can this resource contribute, in this portfolio, under these conditions?