Chapter 14: Demand Can Be Flexible Too
When an electricity system needs more room to meet demand, one possible response begins on the demand side. A customer may be able to use less electricity during a difficult hour, or move some use to a different hour. Either change can reduce the power the rest of the system must supply at the time of need.
The distinction matters. Moving electricity use changes its timing; reducing it may mean the activity is forgone or accomplished with less electricity. Both can help in a specified period, but they leave different questions for the hours that follow and for the people providing the response.
The U.S. Department of Energy’s 2024 report on resource adequacy includes demand-side resources among the options a system can consider alongside generation, storage and transmission. Ontario’s March 2026 resource-adequacy methodology also includes demand-side resources in its modeled assessment. Neither source makes every instance of customer flexibility available on demand: an assessment depends on the assumptions used to describe it. [S8] [S13]
Demand flexibility is an umbrella term for a change in electricity use relative to what it otherwise would have been, made in a way that helps address a system need. The word relative does important work. A factory, household or other customer might consume less in an hour for many reasons. To describe a reduction as a response to a system request, we need a reasonable account of what consumption would have been without that response. That unobserved comparison is often called a baseline. A measurement method can estimate the event reduction as the baseline minus observed load; because the baseline is modeled, that estimate can carry error. [S20]
Consider two possible changes. In the first, an activity scheduled for a constrained hour can be completed later. The electricity use has been shifted. In the second, an activity is reduced during that hour and is not made up later within the period being examined. For that period, it is a curtailment: less electricity is consumed than in the comparison schedule. In practice, a response can contain elements of both, and determining the result requires looking beyond the critical hour.
The distinction is easiest to see with invented numbers.
Moving a block of demand
Return to the hypothetical region. Suppose a group of participants has a scheduled activity that would draw a constant 100 megawatts, or MW, from 5 p.m. to 6 p.m. Assume the whole activity can be moved to 8 p.m. to 9 p.m. on the same day. The group uses no power for this activity during the first hour and draws the same constant 100 MW during the later hour.
At the original time, the change is a reduction of 100 MW for one hour. At the later time, it is an increase of 100 MW for one hour, relative to the original schedule. Power multiplied by time gives energy: each block is 100 MW × 1 hour, or 100 megawatt-hours, written 100 MWh. Under these deliberately simple assumptions, the same 100 MWh of consumption has moved from one hour to the other. [S12]
Suppose the rest of the region’s demand is unchanged, and total demand under the original schedule would have been 1,000 MW from 5 p.m. to 6 p.m. and 800 MW from 8 p.m. to 9 p.m. The shift changes those figures to 900 MW and 900 MW respectively. The earlier hour is easier to serve by 100 MW, while the later hour requires 100 MW more. Over these two one-hour intervals, the total energy demanded remains 1,800 MWh in either schedule.
That result is useful, but it is not automatically a reliability success. The shift helps the earlier hour only if the assumed response is delivered when needed. The later hour must also be able to accommodate the additional demand. If 8 p.m. to 9 p.m. is itself constrained, moving the activity there could exchange one problem for another. The arithmetic identifies the change in the load profile; it does not establish that either hour is adequately supplied.
The example also assumes the activity consumes exactly the same energy in either hour and can run at the same power. Those are exercise assumptions, not general properties of shifted demand. A real assessment would need evidence about what participants can actually move, how long the change can last and what happens after the requested period.
A separate reduction
Now consider a different hypothetical response. From 5 p.m. to 6 p.m., another group reduces an activity that would otherwise have drawn 60 MW. Assume that the reduction lasts for the entire hour and that none of this activity or its electricity use is made up during the rest of the day.
The reduction in demand during the critical hour is 60 MW. The energy not consumed in that hour is 60 MW × 1 hour, or 60 MWh. Under the stated assumption that there is no later make-up, the day’s electricity consumption is also 60 MWh lower than in the comparison schedule.
This response differs from the 100 MWh shift. The shift relieves the first hour and adds demand to the second; the curtailment relieves the first hour without an offsetting addition in the period examined. That does not mean the curtailment is free of consequences. The participant has accepted a change in activity, and the nature of that change matters when judging whether the arrangement is workable.
The two responses could also be combined in a purely illustrative calculation. If both occurred as stated, the 5 p.m. to 6 p.m. demand of 1,000 MW would fall by 100 MW plus 60 MW, to 840 MW. The shifted activity would add 100 MW to the later hour, taking it from 800 MW to 900 MW. Across the two hours, energy would fall from 1,800 MWh to 1,740 MWh: the 60 MWh difference comes from the assumed curtailment, not from the shifted block.
This balance is a way to keep the accounting straight. It is not evidence that a real group of customers can provide 160 MW, or that a system operator could count on it. Those questions require a description of participants, arrangements and performance.
What is being offered?
A generator’s output is often described in megawatts at a particular time. A demand-side offer also needs a power quantity and a time, but that is only the beginning. A proposed 100 MW reduction could mean different things depending on how quickly it must begin, how long it must continue and how often participants can be asked to provide it.
Imagine the hypothetical region needs help for three consecutive hours. A participant able to reduce demand by 100 MW for one hour has not, on that description alone, offered 100 MW for the whole need. The participant might be able to maintain a smaller reduction for longer, or might need a break before responding again. Those possibilities must be specified rather than assumed.
The timing of advance notice can matter too. An activity may be movable when its schedule can be changed ahead of time but difficult to interrupt once under way. Conversely, an activity that can pause briefly may not be suitable for a sustained reduction. The service a participant can offer should be described in terms that fit the need: start time, duration, magnitude and any limits on repeated requests.
Location also belongs in the description. A reduction changes demand where the participating customer is connected. A system-wide reduction may be useful for a broad supply need, while a need in a constrained part of the network requires attention to where the response occurs. Counting a reduction without considering its location can leave unanswered whether it addresses the problem being studied.
These are questions to ask, not a list of capabilities that every participant possesses. The answer depends on the activity and the arrangement. A customer who can change a schedule may still face a deadline. Someone considering a reduction may need to preserve an essential service. A program design that ignores such constraints may describe more flexibility on paper than participants are prepared to provide.
The hour after the request
A shifted activity creates an obvious later load in the exercise: the full 100 MW appears from 8 p.m. to 9 p.m. Other responses may also be followed by increased use. Rebound describes increased post-event load that makes up for use forgone during the event, relative to the relevant comparison schedule. Its estimated size and timing depend on measurement and can carry baseline-model error; they cannot be inferred merely from the reduction observed during the requested hour. [S20]
The later increase need not equal the earlier reduction. A particular response could involve a full shift, a partial make-up, additional consumption or no make-up over the period studied. Those are different possibilities, not measured outcomes established by the example. To understand a real event, an evaluator would need a suitable baseline and measurements covering both the requested interval and the relevant period afterward.
That requirement makes a demand resource different from a simple entry in a balance sheet. The observed meter reading tells us how much electricity a participant used; it does not directly reveal how much the participant would have used without the request. A baseline is an estimate of that counterfactual. Its construction can affect the calculated response and rebound, so the method deserves scrutiny along with the reported result. [S20]
For a real program, useful evidence would include its participation rules, the definition of the baseline, the time windows measured and evaluations of actual events. Those records would help answer whether a claimed reduction was delivered, how long it persisted and what followed. They would also provide a basis for examining costs. The hypothetical calculations alone cannot answer any of those questions.
From an individual response to a planning assumption
An adequacy assessment asks whether the resources available to a system can meet demand under specified conditions. Demand-side resources can enter that question as part of the portfolio. Ontario’s March 2026 methodology describes a chronological assessment that includes demand-side resources alongside demand forecasts, resource performance and transmission assumptions. The result of such an assessment belongs to its modeled system and inputs; it does not establish a universal value for every form of flexible demand. [S13]
The planning question is broader than whether a participant can respond once. It includes whether the response is assumed to be available during the particular hours when the system needs it, how long it can be sustained and how its limits interact with other resources. If the difficult period recurs, a model must represent the relevant constraints rather than simply repeat the most favorable hour.
This is also why a reduction in demand should not be treated as interchangeable with stored energy. Both can change the balance during a specified interval, but the source of the change is different. A store delivers electricity that was charged earlier, subject to its power and energy limits. A demand response changes customer consumption relative to a comparison schedule, subject to the participant’s ability and willingness to make that change. Either contribution can be useful; neither can be understood from a megawatt figure alone.
A practical way to read a proposal is to write down two profiles: expected consumption without the response and expected consumption with it. Compare them hour by hour, including the hours before and after the need. Then ask which parts are supported by measured performance and which remain assumptions. For an actual program, the baseline and event evaluations are essential to that distinction.
Flexible demand gives a planner another way to ask the central question of this book. Instead of asking only how much additional electricity can be supplied at 5 p.m., the planner can also ask which electricity uses can change at that time, on what terms and with what consequences later. The answer is a conditional contribution to a portfolio: valuable when its timing and constraints fit the need, and requiring evidence before its promised response can be counted on.